Clifton Park bridge to close all-summer for major reconstruction project

[anvplayer video=”5113423″ station=”998132″]

The Sitterly Road Bridge in Clifton Park will be closed starting on June 18.

The bridge was struck by construction equipment last year, and it needs to be replaced.

During the closure, the temporary span over the Northway will be removed and parts of the old bridge will be demolished. Then a new bridge will go up.

The work is scheduled to coincide with summer break.

The bridge is set to reopen on Monday, September 12.